A hire rate is a promise that the asset will pay for itself. Build it from the cost of owning the kit, not from last year's card.

How hire rates are built from cost of ownership

Three annual costs make the total. Depreciation is the purchase cost minus what you can sell the asset for, divided by the years you keep it.

Formula (purchase cost − residual value) ÷ working life

Finance is the loan interest, spread over that same working life, or your cost of capital if you bought it outright. Bought outright, cost of capital applies to the average of the purchase price and the residual value. On a loan, the deposit reduces what is financed, and the interest is spread over the whole life so the quoted rate stays level from the first year to the year you sell.

Formula Loan interest ÷ working life, or average capital × cost of capital

Running costs are servicing, statutory inspections, insurance, tracking, storage, and transport when you do not charge it separately. Simple mode replaces those lines with one percentage of the purchase price, 15% a year by default. Fine for a small tool. Usually too blunt once a machine has inspections and a tracker.

Hire days are working days times utilisation. The break-even day rate is the annual cost divided by those days. The recommended rate divides break-even by one minus the margin. Adding 25% to cost only leaves a 20% margin. The week rate is the day rate times your week multiplier, and the month rate is the week rate times the month multiplier. Defaults are 3 and 2.5. In the US the same page is an equipment rental rate calculator, and a way to answer how to price equipment rental. The name changes. The sum does not.

Formula Break-even day rate ÷ (1 − target margin)

Why the week rate is usually about three days

Five days on a day rate cost five day rates. A week at about three is the discount most UK plant hirers recognise for a committed week. It is a commercial choice. Move it towards 4 or 5 when the hire is short, delivery is expensive, or the customer will off-hire mid-week. Lower it when you would rather lock a long booking than deliver twice. At 2.5 times the week rate, a month is cheaper per day than a run of weeks. On long-term monthly rental, nearer 2 often wins the work. If you cut it, check the loan years still get paid.

A mini excavator and a small tool

The calculator opens on a 1.5 tonne mini excavator: £28,000, kept 8 years, 20% residual, 10% deposit, 8% finance over 5 years, plus servicing, inspections, insurance, a tracker and a share of the depot. Transport is zero because this yard charges it on the job. At 260 days, 60% utilisation and a 25% margin the card is £54 a day, £162 a week and £405 a month.

At 60% utilisation you need £54 a day to make a 25% margin. Break-even is £40 a day. Payback is 39.9 months. The same machine needs £81 a day at 40% utilisation and £40 a day at 80%. That gap is the price of idle time. These figures are an illustration, not a market quote.

The whole-life rate recovers depreciation, interest and running costs over 8 years. The loan also wants principal back in the first 5, so on these inputs the recommended rate sits just under cash break-even while the finance runs. The asset pays its way on paper and still needs cash from elsewhere. Cover repayments lifts the day rate so the loan years wash their face, and shows the lower rate you could use once only running costs are left.

A 110v breaker bought outright for £450, kept 4 years with no residual, is a different shape. There is no loan. An 8% cost of capital covers the money tied up, and running costs are a simple 15% of the purchase price. The rate is £1.69 a day, £5.08 a week and £13 a month. Here the week multiplier decides whether the tool earns or just circulates.

1.5t mini excavator110v breaker
How it is funded5-year loan, 8-year lifeBought outright
Day rate at 60%£54£1.69
Week / month£162 / £405£5.08 / £13
What to watchCash during the loanThe week multiplier

Financing kit for less time than you keep it

A 5-year loan on an 8 or 10 year machine is normal. Put all the interest into the loan years and the price falls off a cliff when the loan ends. Spread the interest over the working life and the list price can stay level. That level rate is not always the right cash plan. During the loan the bank takes the full repayment. Afterwards only running costs leave, and the cash margin jumps. The loan is cleared after year 5. From year 6 your cash margin rises from -6.5% to 66.4%.

If the finance term is longer than the working life, the calculator warns and still prices the rate. You would be selling an asset that is still financed, so the residual has to clear the balance. A higher residual only helps if you can get the money.

What to include that people forget

LOLER thorough examinations, PUWER inspections and third-party certificates expire whether the asset is on hire or in the yard. The tracker is the hardware and the SIM. Storage includes a fair share of the depot. Transport belongs in the rate only when you do not charge it as its own line, or you will price it twice.

Downtime is the one people count twice. Weeks in the workshop are lost hire days, so they belong in utilisation and not as a second bill. A rate that is right on paper still leaks if off-hire is a phone call and damage is never recharged. The off-hire and damage recharges guide is how that margin survives a dispute.

Pricing in the UAE

The 286-day preset is a six-day week with room for public holidays and a short shutdown. It is a default, not a statute. Edit it. Keep project mobilisation out of the day rate when you bill it separately. On a long hire the month multiplier does more work than the day rate: price the month so the cash check still holds, and keep a day rate for the gaps. AED, GBP, USD and EUR use the same sums.

When to raise the rate or dispose of the asset

Raise the rate when real utilisation needs a higher day rate than you charge, when servicing has stepped up and the card still assumes a new machine, or when you are fully booked at break-even. A busy fleet on a thin rate does not fund the replacement.

Dispose when the rate you would need, at a utilisation you have actually hit, is more than customers will pay, or when cash break-even during the loan is more than the market and you cannot wait for the later years. Test a higher residual before you commit to another season. It only counts if the sale will bring the money in. Until then, the utilisation figure on this page is still a guess.

Frequently asked questions

How do you calculate a plant hire day rate?

Add depreciation, finance and running costs for a year, then divide by the days you expect the asset to be on hire. That is the break-even day rate. Divide again by one minus your target margin. Adding 25% on top of cost only leaves a 20% margin.

Why is a week rate about three times the day rate?

It is the usual discount for a committed week, against five days charged one at a time. Raise the multiplier when hires are short or delivery is expensive. Lower it for a long booking. The multiplier in the calculator is yours to set.

Should the rate cover the loan or the whole life of the machine?

Whole life is the right list price: interest is spread over the years you keep the asset, so the rate stays level. Cover repayments is the cash price for the loan years. Use it when the level rate would not fund the payments, and review the rate once the loan is cleared.

What costs do hire companies leave out?

Statutory inspections, the tracker and its SIM, insurance, a share of depot storage, and transport you do not charge separately. Put downtime into utilisation. Counting it again as a cost inflates the rate.

How should equipment rental rates differ in the UAE?

Start from a six-day week. The 286-day preset leaves room for public holidays and a short shutdown, and you should edit it. Keep mobilisation out of the day rate when you bill it separately, and give the month multiplier as much attention as the day rate.